Wes HawkinsLas Vegas Recording Connection

Week 4 Posted on 2015-03-02 by Wes Hawkins

Connectivity.  This week I got to take apart and check out the inner workings and outer ports of a 192 ADDA converter, making note of the different cable/routing options.  I then got to work testing over 100 cables in the warehouse which was a great hands-on exercise to get familiar with many of the cables mentioned in the cirriculum literature.  Using an analog cable tester reenforced the structure of unbalanced cables.  There are three lights on this particular tester- Hot, Cold, and Ground.  The Cold and Ground lights both illuminate when an unbalanced cable is functioning properly, as opposed to independently lighting up for a balanced cable.

« Return to Wes Hawkins's Blog

More Blog Entries from Wes Hawkins

Wes Hawkins

Jet-setterPosted by Wes Hawkins on 2015-07-14

Since my last post, I've been back and forth between Las Vegas and San Diego, piece-by-piece tracking a demo for my own band in San Diego, DETHSURF, and mixing it in Vegas... Read More >>